HIGH LEVEL INFRASTRUCTUREIN TIER III STANDARDS

1GBit instant internet access, 2 main backbone high speed server, hosting and all other services infrastructure.

INFRASTRUCTURE

BUILDING

Radore has 4 data center rooms with a total area of 1.035 m2 including 520 m2, 110 m2, 285 m2 and 120 m2. MetroCity AVM in Levent, Istanbul -4. on the floor. Construction of MetroCity AVM was completed in 2002 and opened in 2003. MetroCity AVM is built on the Metro transport line.

ENERGY

The energy capacity of the Radore Data Center is 4.2 MW for 1.6 MW white space, 1 MW for office areas and 1.6 MW for spare. The energy is transferred to the Radore Data Center in MetroCity AVM, which belongs to Radore, with two main, one spare and three different distribution trays. The transformers belonging to the Radore Data Center are connected to the medium voltage ring network and thus are backed up by feeding from two points.

AIR CONDITIONING

Free cooling" technology is used in Radore Data Center air-conditioning. "Free cooling" is an economical air conditioning method that makes it possible to use the low air temperature in the outdoor environment for cooling the water used for air conditioning. It has the "free cooling" infrastructure in the data center.

CORPORATE MENU